Skip to content
  • Home
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
    • Health & Fitness
  • Events
  • Health & Fitness
  • PSU
  • International

INDIA BUREAUCRACY – News from Indian Bureaucracy Diaspora

India Bureaucracy, Bureaucracy News, IAS,IPS, Transfers, Postings, News from government bodies & global news

  • Home
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
    • Health & Fitness
  • Events
  • Health & Fitness
  • PSU
  • International

Flash News

Saket Kumar IAS has been empanelled to the grade of Joint Secretary in Government of India.

Armstrong Pame IAS officer Manipur 2009 batch has been empanelled to the grade of Joint Secretary in Government of India.

M Ramachanduru IAS has been empanelled to the grade of Joint Secretary in Government of India.

Sushma Chauhan IAS officer AGMUT 2009 batch has been empanelled to the grade of Joint Secretary in Government of India.

Tuesday, July 01, 2025

Tag: operating under a head of 131.2 metres. Besides supply and installation of these Francis Turbines

BHEL SUCCESFULLY COMMISSIONS 4 UNITS OF NTPC 4*200 MW IN HIMACHAL PRADESH
PSU

BHEL SUCCESFULLY COMMISSIONS 4 UNITS OF NTPC 4*200 MW IN HIMACHAL PRADESH

India bureaucracy June 17, 2015

New Delhi: Bharat Heavy Electricals Ltd. (BHEL) has successfully commissioned all the four units of NTPC’s 4×200 MW Koldam Hydro Electric Project (HEP) in Himachal Pradesh. Significantly, all the four … Read More

2015. With the commissioning of these units by BHELall the four units of the project have been commissioned by BHEL within a short span of just 75 daysassociated station auxiliaries and Electrical & Mechanical Balance of Plant (BoP) equipment.BHEL’s scope included supply and installation of matching synchronous Generatorscommencing with the commissioning of the first unit on 30th Marchdigital governorsmain inlet valvesNew Delhi: Bharat Heavy Electricals Ltd. (BHEL) has successfully commissioned all the four units of NTPC’s 4×200 MW Koldam Hydro Electric Project (HEP) in Himachal Pradesh. SignificantlyNTPC has made its maiden entry in the hydro sector. Located at the embankment on River Sutlej in Mandi district of Himachal Pradeshoperating under a head of 131.2 metres. Besides supply and installation of these Francis Turbinesstate-of-the-art control & monitoring system (SCADA)static excitation systemthe surface power house is the first hydro project of NTPC. The power house comprises four Francis Turbines of 200 MW rating each

July 2025
MTWTFSS
 123456
78910111213
14151617181920
21222324252627
28293031 
« Feb    

Informative Links

IAS officers Posting

https://dopt.gov.in/posting-of-ias-officers-list

Proudly powered by WordPress | Theme: TimesNews | By Theme Freesia.